Enbridge Inc., Calgary, says it will proceed with the second phase of a $120 million (Can.) project to expand its main crude oil pipeline system in western Canada. The 76-mile project will add capacity of 40,000 b/d to the line between Enbridge oil terminals at Hardisty, Alta., and Kerrobert, Sask., and increase total line capacity to 1.84 million b/d.